SpaceX has targeted September 22 for Starship Flight 14, the vehicle’s first attempt at stable low-Earth orbit insertion and deployment of 26 operational Starlink V3 satellites. Booster 21 and Ship 41 completed full-duration static fires in late August after hardware and software upgrades addressing Flight 13 engine relight issues and heat-shield tile retention. The mission profile includes a 275 km orbital insertion burn, satellite deployment, a single-engine deorbit burn, and controlled splashdowns rather than tower catches. Traders are monitoring final stacking progress, FAA regulatory clearance for the expanded airspace window, and any last-minute range or weather constraints ahead of the 75-minute launch opportunity.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于$675,080 交易量
9月19日
1%
9月26日
82%
9月30日
91%
10月31日
81%
成功溅落?
86%
超级重型助推器会爆炸?
89%
筷子能接住超级重型助推器吗?
2%
筷子接住星舰?
3%
$675,080 交易量
9月19日
1%
9月26日
82%
9月30日
91%
10月31日
81%
成功溅落?
86%
超级重型助推器会爆炸?
89%
筷子能接住超级重型助推器吗?
2%
筷子接住星舰?
3%
The outcome of any launch will be corroborated by examining official video provided by SpaceX (https://www.youtube.com/c/SpaceX), as well as secondary video feeds and/or written reports if necessary.
Any subsequent anomaly (e.g., an explosion) after the launch will have no bearing on the outcome. Any name change of the Starship with another vehicle will have no bearing on the outcome of the market.
市场开放时间: Sep 1, 2026, 10:32 AM ET
The outcome of any launch will be corroborated by examining official video provided by SpaceX (https://www.youtube.com/c/SpaceX), as well as secondary video feeds and/or written reports if necessary.
Any subsequent anomaly (e.g., an explosion) after the launch will have no bearing on the outcome. Any name change of the Starship with another vehicle will have no bearing on the outcome of the market.
SpaceX has targeted September 22 for Starship Flight 14, the vehicle’s first attempt at stable low-Earth orbit insertion and deployment of 26 operational Starlink V3 satellites. Booster 21 and Ship 41 completed full-duration static fires in late August after hardware and software upgrades addressing Flight 13 engine relight issues and heat-shield tile retention. The mission profile includes a 275 km orbital insertion burn, satellite deployment, a single-engine deorbit burn, and controlled splashdowns rather than tower catches. Traders are monitoring final stacking progress, FAA regulatory clearance for the expanded airspace window, and any last-minute range or weather constraints ahead of the 75-minute launch opportunity.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于



警惕外部链接哦。
警惕外部链接哦。
常见问题