The Doge-1 lunar CubeSat, a crypto-funded payload managed by Geometric Energy Corporation and originally paid for in Dogecoin, sits at the center of trader attention with a targeted September 14, 2026, Falcon 9 rideshare liftoff. Years of repeated slips since the 2021 announcement have tempered optimism, yet recent manifest updates and alignment with optimal lunar windows have firmed consensus around a near-term launch. SpaceX scheduling pressure, final payload integration, and any last-minute scrubs remain the primary swing factors that could push resolution. A clean September departure would mark the first major crypto-backed lunar mission and validate meme-driven hype, while further delays highlight the inherent unpredictability of commercial space timelines.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于Doge-1月球任务会在……之前发射吗?
$973,945 交易量
2026年12月31日
4%
2027 年 6 月 30 日
53%
2027年12月31日
66%
$973,945 交易量
2026年12月31日
4%
2027 年 6 月 30 日
53%
2027年12月31日
66%
The outcome of any launch will be corroborated by examining official video provided by SpaceX (https://www.youtube.com/c/SpaceX), as well as secondary video feeds and/or written reports if necessary.
Any subsequent anomaly (e.g., an explosion) after the launch will have no bearing on the outcome. Any name change of the satellite with another vehicle will have no bearing on the outcome of the market.
市场开放时间: Jan 7, 2026, 6:07 PM ET
The outcome of any launch will be corroborated by examining official video provided by SpaceX (https://www.youtube.com/c/SpaceX), as well as secondary video feeds and/or written reports if necessary.
Any subsequent anomaly (e.g., an explosion) after the launch will have no bearing on the outcome. Any name change of the satellite with another vehicle will have no bearing on the outcome of the market.
The Doge-1 lunar CubeSat, a crypto-funded payload managed by Geometric Energy Corporation and originally paid for in Dogecoin, sits at the center of trader attention with a targeted September 14, 2026, Falcon 9 rideshare liftoff. Years of repeated slips since the 2021 announcement have tempered optimism, yet recent manifest updates and alignment with optimal lunar windows have firmed consensus around a near-term launch. SpaceX scheduling pressure, final payload integration, and any last-minute scrubs remain the primary swing factors that could push resolution. A clean September departure would mark the first major crypto-backed lunar mission and validate meme-driven hype, while further delays highlight the inherent unpredictability of commercial space timelines.
基于Polymarket数据的AI实验性摘要。这不是交易建议,也不影响该市场的结算方式。 · 更新于

警惕外部链接哦。
警惕外部链接哦。
常见问题